Open the demo
1st place, Open Grid DataBase Power × AITX Hackathon 2026

Know which co-op to call next, and what to bring.

107 ERCOT co-ops and munis, ranked by where demand is really growing.

8.8 GW approved to energize
232.5 GW requested by large loads
ERCOT Monthly, January 2026

Watch the demo.

The walkthrough submitted to the Base Power × AITX Hackathon.

Texas demand is growing. Just not where the headlines say.

Prospecting off the headline means chasing megawatts that never show up.

Summer 2026 peak

Preliminary forecast 112 GW
Actual 91.1 GW
ERCOT preliminary LTLF (PUCT 58777) and observed peak. Drawn to scale.

Sell capacity to the utilities that will need it, right when they need it.

Co-ops and munis can't switch retail providers. Base sells them dispatchable MW from its home-battery fleet, instead of a new peaker.

Who

Who will need it

Co-ops and munis whose peak is really growing, not just in the headlines.

When

When to call

Before they sign a PPA or build a peaker. Every account carries a call-by date.

With what

What it's worth to them

The 4CP transmission cost each MW avoids, in dollars per year.

Partnerships

Which co-ops and munis to approach next, and the 4CP case to bring to each.

Sales

Where retail-direct demand is really growing, county by county.

Four questions, four screens.

Accounts

Who do we call, and with what?

107 co-ops and munis sorted into call now, nurture, watch or hold, each with its trigger, deadline and pitch.

Explorer

Where is growth real?

Texas by county: acquisition priority by channel, the generation queue and new data centers.

Forecast

How much load is really coming?

Summer peak to 2030 by weather zone, P10 to P90, against ERCOT's official lines.

Backtest

Can we trust the numbers?

Our model and every ERCOT vintage, scored against the actual peak.

Built by Pablo Brenner

Let's talk.

A solo build, end to end: the data pipelines, the API and this app.